Fiscal Note
The cost for the remainder of 2013 is approximately $1,195 (or $1,360 including benefits) and is available in the Water Utility operating budget. The projected annualized cost is $6,140 (or $7,015 including benefits).
Title
Recreating the Cross Connection Control Inspectors (#1794, #1806, #1852) in CG16/R16.
Body
Resolution deleting the classification of Cross Connection Control Inspector in CG16, R15 and recreating it in CG16, R16.
Resolution recreating three 1.0 FTE positions (#1794, #1806, #1852) from Cross Connection Control Inspectors (CG16, Range 15) in the permanent salary detail of the Water Utility budget, into Compensation Group16, Range 16; and reallocating the incumbents to the new positions, thereof.