Madison, WI Header
File #: 30307    Version: 1 Name: Reallocate incumbent Peter Holmgren to the budgeted level of Engineer 3 in the Water Utility budget.
Type: Resolution Status: Passed
File created: 5/22/2013 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 6/18/2013 Final action: 6/18/2013
Enactment date: 6/19/2013 Enactment #: RES-13-00452
Title: Reallocate incumbent Peter Holmgren to the budgeted level of Engineer 3 in the Water Utility budget.
Sponsors: Paul R. Soglin
Attachments: 1. PB Memo Water Engineer 3.pdf, 2. Water Engineer PD.pdf
Fiscal Note
The cost for the remainder of 2013 is approximately $1,400 (or $1,600 including benefits) and is available in the Water Utility budget.  The projected annualized cost is $6,500 (or $7,400 including benefits).
 
Title
Reallocate incumbent Peter Holmgren to the budgeted level of Engineer 3 in the Water Utility budget.  
 
Body
Resolution reallocating the incumbent of position #4316 to the budgeted level of Engineer 3, Compensation Group 18, Range 10, in the Water Utility budget, thereof.