Madison, WI Header
File #: 24879    Version: 1 Name: Engineer 2
Type: Resolution Status: Passed
File created: 12/20/2011 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 1/17/2012 Final action: 1/17/2012
Enactment date: 1/18/2012 Enactment #: RES-12-00043
Title: Recreation of a 1.0 FTE Engineer 2 (CG18-08) position, currently occupied by Y. Tao (#1236), as a Traffic Engineer 2 (CG18-12) within the Traffic Engineering Division budget and reallocation of the incumbent to the new position.
Sponsors: Paul R. Soglin
Attachments: 1. PBMemo Engineer2 Tao.pdf, 2. CD Traffic Engineer 1.pdf, 3. CD Traffic Engineer 2.pdf
Fiscal Note
The estimated annual cost is $13,251 for salary expense, plus $4,810 for benefits, for a total estimated cost of $18,061.  Funding is included in the in the Traffic Engineering 2012 adopted operating budget.
Title
Recreation of a 1.0 FTE Engineer 2 (CG18-08) position, currently occupied by Y. Tao (#1236), as a Traffic Engineer 2 (CG18-12) within the Traffic Engineering Division budget and reallocation of the incumbent to the new position.
Body
Resolution that the 1.0 FTE position of Engineer 2, #1236, in Compensation Group 18, Range 08, in the permanent salary detail of the Traffic Engineering Division budget is deleted and recreated as a 1.0 FTE Traffic Engineer 2 in Compensation Group 18, Range 12, and that the incumbent, Y. Tao, is reallocated to the new position, thereof.