Madison, WI Header
File #: 23989    Version: 1 Name: Recreate the position (#1862) of Engineer 2 as a Water Construction Supervisor in the Water Utility budget, and reallocate the incumbent (T. Buss) to the new position.
Type: Resolution Status: Passed
File created: 9/22/2011 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 10/18/2011 Final action: 10/18/2011
Enactment date: 10/21/2011 Enactment #: RES-11-00881
Title: Recreate the position (#1862) of Engineer 2 as a Water Construction Supervisor in the Water Utility budget, and reallocate the incumbent (T. Buss) to the new position.
Sponsors: Paul R. Soglin
Attachments: 1. PBMemoWaterConstSup.pdf, 2. PD Buss 9-11.pdf, 3. WaterConstructionSupervisorCD.pdf
Fiscal Note
The cost for the remainder of 2011 is approximately $570 (or $814 including benefits) and is available in the Water Utility operating budget.  The projected annualized cost is $3,240 (or $4,600 including benefits).
 
Title
Recreate the position (#1862) of Engineer 2 as a Water Construction Supervisor in the Water Utility budget, and reallocate the incumbent (T. Buss) to the new position.
 
Body
Resolution that position #1862 of "Engineer 2" in Compensation Group 18, Range 08, currently occupied by T. Buss, in the permanent salary detail of the Water Utility budget, is deleted and recreated as a "Water Construction Supervisor" in Compensation Group 18, Range 09, and that the incumbent is reallocated to the new position, thereof.