Fiscal Note
The cost for the remainder of 2011 is approximately $570 (or $814 including benefits) and is available in the Water Utility operating budget. The projected annualized cost is $3,240 (or $4,600 including benefits).
Title
Recreate the position (#1862) of Engineer 2 as a Water Construction Supervisor in the Water Utility budget, and reallocate the incumbent (T. Buss) to the new position.
Body
Resolution that position #1862 of "Engineer 2" in Compensation Group 18, Range 08, currently occupied by T. Buss, in the permanent salary detail of the Water Utility budget, is deleted and recreated as a "Water Construction Supervisor" in Compensation Group 18, Range 09, and that the incumbent is reallocated to the new position, thereof.