Madison, WI Header
File #: 22212    Version: 1 Name: A Resolution approving plans and specifications and authorizing City Engineering to work with the University of Wisconsin, WDNR, City Parks, and Dane County to design, construct, monitor and maintain beach management systems at Bernie’s Beach, at BB Clark
Type: Resolution Status: Passed
File created: 4/22/2011 In control: BOARD OF PUBLIC WORKS
On agenda: 5/3/2011 Final action: 5/3/2011
Enactment date: 5/9/2011 Enactment #: RES-11-00426
Title: A Resolution approving plans and specifications and authorizing City Engineering to work with the University of Wisconsin, WDNR, City Parks, and Dane County to design, construct, monitor and maintain beach management systems at Bernie’s Beach, at BB Clarke Beach, and at Brittingham Beach.
Sponsors: BOARD OF PUBLIC WORKS, Sue Ellingson
Title
A Resolution approving plans and specifications and authorizing City Engineering to work with the University of Wisconsin, WDNR, City Parks, and Dane County to design, construct, monitor and maintain beach management systems at Bernie’s Beach, at BB Clarke Beach, and at Brittingham Beach.
Body
WHEREAS, the City of Madison is a signatory to a Memorandum of Understanding with the WDNR, DATCP, and Dane County acknowledging water quality problems at 6 beaches throughout the City; and

WHEREAS, beaches are most often closed due to high levels of potentially toxic blue green algae; and

WHEREAS, the water quality condition of beaches is affected by source area loading and then transport of substances to beach areas is achieved through lake processes; and

WHEREAS, the ultimate solution of improving water quality in the lakes is reducing the overall level of nutrients in the lakes and these efforts are the centerpiece of past and ongoing watershed management programs; and

WHEREAS, given the above, the suggestion was to improve the quality of the water immediately within the beach swimming area; and

WHEREAS, the method to complete this is to expand on the work successfully completed in 2010 at Bernies Beach and BB Clarke Beach, where deflectors were installed to deflect bacteria and blue green algae at beach areas; and

WHEREAS, deflectors shall be constructed at Bernies Beach and BB Clarke Beach identical to 2010 and an exclosure with filtration, UV treatment, and recirculation of the swimming water shall be constructed as a pilot project at Brittingham Beach; and

NOW, THEREFORE, BE IT RESOLVED that the plans and specifications are hereby approved and City Engineering is authorized to work with the WDNR, UW Madison, City Parks and Dane County to design, construct, monitor and maintain beach management systems at Bernie’s Beach, at BB Clarke Beach, and at Brittingham Beach.

BE IT FURTHER RESOLVED that City Engineering, in cooperation with other agencies, s...

Click here for full text