Madison, WI Header
File #: 22189    Version: 1 Name: Recreation of a 1.0 FTE Engineer 3 (CG18-10) position, currently occupied by S. Sonntag (#3885), as a Engineer 4 (CG18-12) within the Engineering Division budget and reallocation of the incumbent to the new position.
Type: Resolution Status: Passed
File created: 4/20/2011 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 5/17/2011 Final action: 5/17/2011
Enactment date: 5/23/2011 Enactment #: RES-11-00449
Title: Recreation of a 1.0 FTE Engineer 3 (CG18-10) position, currently occupied by S. Sonntag (#3885), as a Engineer 4 (CG18-12) within the Engineering Division budget and reallocation of the incumbent to the new position.
Sponsors: Paul R. Soglin
Attachments: 1. PB Memo Engineer 3 Sonntag.pdf, 2. PosDescEng4 Sonntag.pdf, 3. CD Engineer1-4.pdf
Title
Recreation of a 1.0 FTE Engineer 3 (CG18-10) position, currently occupied by S. Sonntag (#3885), as a Engineer 4 (CG18-12) within the Engineering Division budget and reallocation of the incumbent to the new position.
Body
Resolution that the 1.0 FTE position of Engineer 3, #3885, in Compensation Group 18, Range 10, in the permanent salary detail of the Engineering Division budget is deleted and recreated as a 1.0 FTE Engineer 4 in Compensation Group 18, Range 12, and that the incumbent, S. Sonntag, is reallocated to the new position, thereof.
Fiscal Note
Costs for the remainder of 2011 are estimated at $2,211, or $3,177 including benefits.  These amounts can be accommodated by the management of Engineering Division salary savings.  Annualized future year costs are estimated at $7,176, or $10,312 including benefits.  These amounts would be included in future year operating budget requests.