Madison, WI Header
File #: 18505    Version: 1 Name: Authorizing the Mayor and City Clerk to enter into a design engineering contract with Held Engineering Associates, Inc. for completion of stormwater analysis and design for Arboretum Pond 3 - Improvements Phase 2.
Type: Resolution Status: Passed
File created: 5/13/2010 In control: COMMON COUNCIL
On agenda: 6/1/2010 Final action: 6/1/2010
Enactment date: 6/4/2010 Enactment #: RES-10-00523
Title: Authorizing the Mayor and City Clerk to enter into a design engineering contract with Held Engineering Associates, Inc. for completion of stormwater analysis and design for Arboretum Pond 3 - Improvements Phase 2.
Sponsors: BOARD OF PUBLIC WORKS
Fiscal Note
Funds are available in account #ESTM-54950-810384-00-53W1035; cost is not to exceed $50,000.00.
Title
Authorizing the Mayor and City Clerk to enter into a design engineering contract with Held Engineering Associates, Inc. for completion of stormwater analysis and design for Arboretum Pond 3 - Improvements Phase 2.
Body
This work shall consist of stormwater analysis and design to alleviate a reccurring erosion problem and provide stormwater management improvements for the watershed draining to Arboretum Pond 3.
 
WHEREAS Held Engineering Associates, Inc. is a professional consulting firm qualified to complete this type of work; and
 
WHEREAS it has been determined that Held Engineering Associates, Inc. submitted the best qualified proposal for this project,
 
NOW, THEREFORE, BE IT RESOLVED that the Mayor and City Clerk are authorized to enter into an agreement with Held Engineering Associates, Inc. for consulting engineering services for the Arboretum Pond 3 - Improvements Phase 2.