Fiscal Note
Estimated cost: $412,000 (including contingencies)
Funds are available in:
CS53-58255-810375-00-53W0497 Bridges $294,000
CS53-58240-810375-00-53W0497 Path $118,000
Storm Water Utility will contribute approximately $160,000 to the project in the form of a transfer to account CS53-58255-810375-00-53W0497, in addition to having funded approximately $40,000 for consulting design services.
Title
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for County Grove / Chavez Pedestrian Bridge and Path. (7th AD)
Body
PREAMBLE
Chavez Elementary School is separated from Country Grove Park and approximately half of its attendance district by Upper Badger Mill Creek. Currently, travel between the school and the park and residential neighborhood to the west requires considerable indirection and travel on relative busy streets. The proposed project will provide a safe and convenient bicycle route meeting State and Federal path design standards as well as ADA standards. The connection to Maple Grove Drive will enhance overall bike and pedestrian mobility throughout the neighborhood.
BE IT RESOLVED,
1) That the plans and specifications for County Grove / Chavez Pedestrian Bridge and Path, be and are hereby approved.
2) That the Board of Public Works be and is hereby authorized to advertise and receive bids for said project.
3) That the Mayor and City Clerk are hereby authorized to accept dedication of lands and/or easements from the Developer/Owner for public improvements located outside of existing public fee title or easement right-of-ways.