File #: 17271    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street and terrace improvements constructed by Private Contract In Metropolitan Place PUD - Phase II, Private Contract No. 2036.
Type: Resolution Status: Passed
File created: 1/26/2010 In control: BOARD OF PUBLIC WORKS
On agenda: 2/23/2010 Final action: 2/23/2010
Enactment date: 2/26/2010 Enactment #: RES-10-00159
Title: Accepting sanitary sewer, storm sewer, and street and terrace improvements constructed by Private Contract In Metropolitan Place PUD - Phase II, Private Contract No. 2036. (4th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2036.pdf
Title
Accepting sanitary sewer, storm sewer, and street and terrace improvements constructed by Private Contract In Metropolitan Place PUD - Phase II, Private Contract No. 2036. (4th AD)
Body
WHEREAS, Metropolitan Place Development, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street and terrace improvements by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Metropolitan Place PUD - Phase II


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street and terrace improvements be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 2,860.00

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 2,860.00
b) Sewer Laterals $ -0-_

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $ 2,860.00

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $ 5,280.00


4. That the street and terrace improvements on the following streets be and are hereby accepted:

· W. Mifflin Street from N. Broom Street to 324 ft NE
· N. Broom Street from W. Mifflin Street to 228 SE


The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure valu...