Madison, WI Header
File #: 15774    Version: 1 Name: 9255 MG&E Easement at Lien Road
Type: Resolution Status: Passed
File created: 8/24/2009 In control: BOARD OF PUBLIC WORKS
On agenda: 9/1/2009 Final action: 10/6/2009
Enactment date: 10/8/2009 Enactment #: RES-09-00846
Title: Authorizing the execution of an Underground Utility Easement to Madison Gas and Electric Company across a portion of a City-owned Stormwater Utility parcel located at 5307 Lien Road.
Sponsors: Joseph R. Clausius
Attachments: 1. Exhibit A Easement Scan.pdf, 2. 9255 Location Map Scan.pdf
Fiscal Note
$500.00 Administrative Fee to be deposited into Account No. GN01-78231.
Title
Authorizing the execution of an Underground Utility Easement to Madison Gas and Electric Company across a portion of a City-owned Stormwater Utility parcel located at 5307 Lien Road.
Body
WHEREAS, Madison Gas and Electric Company ("MG&E") is relocating underground electric facilities along Lien Road, in conjunction with the City of Madison Engineering Project No. 53W0127 Lien Road reconstruction; and
 
WHEREAS, as part of the relocation of the underground electric facilities, MG&E has requested a ten (10) foot wide underground electric line easement ("Easement") across a portion of a City-owned Stormwater Utility parcel  located at 5307 Lien Road; and
 
WHEREAS, the City Engineering Division has reviewed and approve of the Easement,
 
NOW, THEREFORE, BE IT RESOLVED that the Mayor and the City Clerk are hereby authorized to execute an Underground Utility Easement with Madison Gas and Electric Company for the Easement described as follows:
 
A strip of land, ten (10) feet in width, located in part of the Outlot 2, Ridgewood the Drumlin Addition, in the NEĀ¼ of Section 34, Town 8 North, Range 10 East, City of Madison, Dane County, Wisconsin, said the centerline of said easement strip being more particularly described as follows:
 
The right-of-way shall be located five (5) feet on the right side and five (5) on the left side of the centerline of the Grantee's facilities as constructed.  The facilities will be located approximately as set forth in the drawing attached hereto as Exhibit "A" and dated August 13, 2009
 
The area of the Easement is depicted on attached Exhibit A.