File #: 13734    Version: Name: Approving the Environmental Assessment for the Pleasant View Road Extension and approving the roadway geometry contained in the Environmental Assessment.
Type: Resolution Status: Passed
File created: 2/18/2009 In control: BOARD OF PUBLIC WORKS
On agenda: 3/17/2009 Final action: 3/17/2009
Enactment date: 3/18/2009 Enactment #: RES-09-00273
Title: AMENDED - Approving the Environmental Assessment for the Pleasant View Road Extension and approving the roadway geometry contained in the Environmental Assessment. (9th & 1st ADs)
Sponsors: Paul E. Skidmore, Jed Sanborn
Attachments: 1. Pleasant View Rd extension_entire length.pdf, 2. Pleasant View Rd extension_north roundabout.pdf, 3. Pleasant View Rd extension_south roundabout.pdf, 4. 13734 Registration Stmt.pdf
Title
AMENDED - Approving the Environmental Assessment for the Pleasant View Road Extension and approving the roadway geometry contained in the Environmental Assessment. (9th & 1st ADs)
Body
Preamble

On March 13, 2007 the City of Madison and Ayres Associates, Inc entered into an agreement for the preparation of plans and specifications for the extension of Pleasant View Road from the existing Mineral Point Road and Pleasant View Road intersection southerly to the intersection of CTH M and Valley View Road.

The proposed design calls for a roundabout to be constructed at the Mineral Point Road and Pleasant View Road intersection and at the CTH M, Pleasant View Road and Valley View Road intersection. The proposed design calls for the construction of a two lane round about at both locations. Based on traffic projections, the two lane roundabout is adequate at these locations until about the year 2025. Beyond that time frame, the roundabout capacity is expected to begin to fail to meet traffic demands and the roundabouts would need to be expanded to a three lane roundabout or converted to a signalized intersection. Roundabouts are being proposed because they have a history of fewer crashes when compared to a traffic signal and the severity of the crashes tends to be less.

The extension of Pleasant View Road, as currently proposed, was called for in the Pioneer Neighborhood Plan and is included in the Preliminary Plat of the University Research Park.

The Pleasant View Road extension is planned for 2010 construction. The design for the project is being closely coordinated with the project at Mineral Point Road and CTH M planned for 2011 and 2012.

Now therefore be it resolved that the Environmental Assessment for the Pleasant View Road Extension, the CTH M, Valley View Road, and Pleasant View Road Intersection, and the Mineral Point Road and Pleasant View Road Intersection is hereby approved, and

Be it further resolved that the roadway geometry for t...