Madison, WI Header
File #: 13700    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In the Eighth Addition to Blackhawk - Phase II, Private Contract No. 2147.
Type: Resolution Status: Passed
File created: 2/16/2009 In control: BOARD OF PUBLIC WORKS
On agenda: 3/17/2009 Final action: 3/17/2009
Enactment date: 3/18/2009 Enactment #: RES-09-00260
Title: Assessing Benefits - Milwaukee Street Reconstruction Assessment District - 2007. (3rd AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. accpr sss - 2147.pdf
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Assessing Benefits - Milwaukee Street Reconstruction Assessment District - 2007. (3rd AD)
Body
WHEREAS, McKenzie 300 Corporation, Inc. has satisfactorily completed the installation of sanitary
sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:
Eighth Addition to Blackhawk - Phase II
NOW, THEREFORE, BE IT RESOLVED
1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.
2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".
SANITARY SEWER ACCOUNTING DATA
A) Total Contract Value (including Engineering
and Miscellaneous Costs) $29,865.00
B) Contributions in Aid of Construction:
a) Public Sewer Components $29,865.00
b) Sewer Laterals $ -0-
C) Investments in Capital (MSU Share) $ -0-
D) Total Plant Value $29,865.00
3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".
Increase in Total Plant Value per Schedule “A” $25,187.25.
4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:
- Blue Aster Trail from the north line of Lot 438 to the north line of Lot 434.
- Silver Sage Trail from the north line of Lot 448 to the north line of Lot 450.
The attached Schedule "A" representing the actual cost of construction of these ...