Madison, WI Header
File #: 13660    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk Phase 4, Private Contract No. 2202.
Type: Resolution Status: Passed
File created: 2/11/2009 In control: BOARD OF PUBLIC WORKS
On agenda: 3/3/2009 Final action: 3/3/2009
Enactment date: 3/4/2009 Enactment #: RES-09-00232
Title: Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk Phase 4, Private Contract No. 2202. (9th AD)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. SSS inc 2202.pdf
Title
Accepting sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) constructed by Private Contract In Eighth Addition to Blackhawk Phase 4, Private Contract No. 2202. (9th AD)
Body
WHEREAS, McKenzie 300 Corporation, Inc. has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:

Eighth Addition to Blackhawk Phase 4, Private Contract No. 2202

NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (including bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $16,797.00

B) Contributions in Aid of Construction:
a) Public Sewer Components $16,797.00
b) Sewer Laterals $ -0-_

C) Investments in Capital (MSU Share) $ -0-

D) Total Plant Value $16,797.00

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $70,548.74

4. That the street improvements, including the bituminous pavement, on the following streets be and are hereby accepted:

- Silver Sage Trail from Shadow Ridge Trail to the south line of Lot 455 (existing street)
- Shadow Ridge Trail from the wes...