Madison, WI Header
File #: 11195    Version: 1 Name: Water Utility Construction Inspector
Type: Resolution Status: Passed
File created: 7/2/2008 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 9/2/2008 Final action: 9/2/2008
Enactment date: 9/3/2008 Enactment #: RES-08-00799
Title: Resolution that the vacant position (#3739) of Engineering Aide 1, in Compensation Group 16, Range 11, in the permanent salary detail of the Water Utility is repealed and recreated as a Water Construction Inspector in Compensation Group 16, Range 14, thereof.
Sponsors: David J. Cieslewicz
Fiscal Note
The cost for the remainder of 2008 is approximately $1,402 (or $1,917, including benefits) and is available in the Water Utility Operating Budget.  The projected annualized cost is $4,230 (or $5,787, including benefits).
Title
Resolution that the vacant position (#3739) of Engineering Aide 1, in Compensation Group 16, Range 11, in the permanent salary detail of the Water Utility is repealed and recreated as a Water Construction Inspector in Compensation Group 16, Range 14, thereof.
Body
Resolution that the vacant position (#3739) of Engineering Aide 1, in Compensation Group 16, Range 11, in the permanent salary detail of the Water Utility is repealed and recreated as a Water Construction Inspector in Compensation Group 16, Range 14, thereof.
Editor's Note:
 
2007 Annual
2007 Annual
2007 Annual
Compensation
Minimum
Maximum
Maximum
Group/Range
(Step 1)
(Step 5)
w/Longevity
16/11
$40,167
$44,793
$50,180
16/14
$43,552
$49,023
$54,912
7