Fiscal Note
The cost for the remainder of 2008 is approximately $1,402 (or $1,917, including benefits) and is available in the Water Utility Operating Budget. The projected annualized cost is $4,230 (or $5,787, including benefits).
Title
Resolution that the vacant position (#3739) of Engineering Aide 1, in Compensation Group 16, Range 11, in the permanent salary detail of the Water Utility is repealed and recreated as a Water Construction Inspector in Compensation Group 16, Range 14, thereof.
Body
Resolution that the vacant position (#3739) of Engineering Aide 1, in Compensation Group 16, Range 11, in the permanent salary detail of the Water Utility is repealed and recreated as a Water Construction Inspector in Compensation Group 16, Range 14, thereof.
Editor's Note:
|
2007 Annual |
2007 Annual |
2007 Annual |
Compensation |
Minimum |
Maximum |
Maximum |
Group/Range |
(Step 1) |
(Step 5) |
w/Longevity |
16/11 |
$40,167 |
$44,793 |
$50,180 |
16/14 |
$43,552 |
$49,023 |
$54,912 |
7