Fiscal Note
Funds are available in the 2008 Water Utility Operating Budget. The projected annualized cost is estimated at $10,161, or $13,982, including benefits.
Title
Resolution that the positions (#1772, #1786, and #1802) of Waterworks Maintenance Worker in Compensation Group 16, Range 09, (occupied by T. Arenson, J. Green, and J. Bakken, respectively) in the permanent salary detail of the Water Utility budget are repealed and recreated as positions of Waterworks Operator 1 in Compensation Group 16, Range 12, thereof.
Body
Resolution that the positions (#1772, #1786, and #1802) of Waterworks Maintenance Worker in Compensation Group 16, Range 09, (occupied by T. Arenson, J. Green, and J. Bakken, respectively) in the permanent salary detail of the Water Utility budget are repealed and recreated as positions of Waterworks Operator 1 in Compensation Group 16, Range 12, thereof.
Be it further resolved that the incumbents shall underfill and/or be advanced within said positions consistent with bargaining agreement provisions.
Editor's Note:
|
2007 Annual |
2007 Annual |
2007 Annual |
Compensation |
Minimum |
Maximum |
Maximum |
Group/Range |
(Step 1) |
(Step 5) |
w/Longevity |
16/09 |
$37,916 |
$42,423 |
$47,502 |
16/12 |
$41,294 |
$45,810 |
$51,298 |