File #: 94052    Version: 1 Name: Authorizing a noncompetitive contract with Arch Solar C&I to remove hail damaged solar modules and install new modules at the Madison Public Market.
Type: Resolution Status: Report of Officer
File created: 7/15/2026 In control: FINANCE COMMITTEE
On agenda: 8/4/2026 Final action:
Enactment date: Enactment #:
Title: Authorizing a noncompetitive contract with Arch Solar C&I to remove hail damaged solar modules and install new modules at the Madison Public Market (District 12)
Sponsors: Satya V. Rhodes-Conway, Julia Matthews
Fiscal Note
The proposed resolution authorizes the Mayor and City Clerk to enter into a noncompetitive contract for Purchase of Services with Arch Solar C&I to remove hail damaged solar modules and install new modules at the Madison Public Market at 202 N First St at an estimated cost of $107,532. Funding for the contract is available in the 2026 Adopted Engineering Capital Budget in the Energy Improvements Program (Munis #16368). It is anticipated that an insurance reimbursement will cover the cost of this contract and the budget will be amended in a future resolution to reflect the insurance reimbursement. At this time, no additional appropriation is required.
Title
Authorizing a noncompetitive contract with Arch Solar C&I to remove hail damaged solar modules and install new modules at the Madison Public Market (District 12)
Body
WHEREAS, in 2023, City Engineering advertised and received bids for a public works contract (8595) for the construction of the Madison Public Market in accordance with WI State Statue 66.0901; and

WHEREAS, the construction project included an alternate (No. 3) to provide a photovoltaic array and all related work that was accepted and awarded with the construction contract; and

WHEREAS, Arch Solar C&I was the subcontractor responsible for installation of the photovoltaic array for the public works contract; and

WHEREAS, Arch Solar C&I completed the installation of the photovoltaic array and the system was given permission to operate from the electrical utility on June 9, 2025; and

WHEREAS, the public works contract specifications for the photovoltaic array included a two year workmanship warranty; and

WHEREAS, 315 of the photovoltaic array’s modules were damaged by hail on April 14, 2026; and

WHEREAS, the damaged modules need to be removed and new modules need to be installed; and

WHEREAS, this will require a contractor that is familiar with the existing photovoltaic array and that will maintain the array’s workmanship warra...