Fiscal Note
The cost for the remainder of 2007 is approximately $2,054 (or $2,810, including benefits). Funds are available within the Engineering Division operating budget. The projected annualized cost is $4,119 (or $5,635, including benefits). There is no anticipated impact upon cost controls or the tax levy.
Title
That the position (#3791) of Construction Inspector 1 in Compensation Group 15, Range 09 (occupied by E. Hoel) in the permanent salary detail of the Engineering Division budget is repealed and recreated as a position of Construction Inspector 2 in Compensation Group 15, Range 11, thereof. Be it further resolved that the incumbent shall be reallocated to said position.
Body
Resolution that the position (#3791) of Construction Inspector 1 in Compensation Group 15, Range 09 (occupied by E. Hoel) in the permanent salary detail of the Engineering Division budget is repealed and recreated as a position of Construction Inspector 2 in Compensation Group 15, Range 11, thereof. Be it further resolved that the incumbent shall be reallocated to said position.
Editor's Note:
|
2007 Annual |
2007 Annual |
2007 Annual |
Compensation |
Minimum |
Maximum |
Maximum |
Group/Range |
(Step 1) |
(Step 5) |
w/Longevity |
15/09 |
$41,463 |
$48,455 |
$54,262 |
15/11 |
$44,081 |
$52,574 |
$58,916 |