Fiscal Note
The proposed resolution authorizes reiumbursement to the property owners of 402 East Mifflin Street at an esimated cost of $10,000. Funding will be provided by the adopted 2019 budget for the Sidewalk program in Engineering Ped-Bike.
MUNIS:
12228-403-200
Title
Authorizing the City Engineer to disburse $10,000 to property owners John Neis and Michelle Isaac for the closure in place of an underground storage vault from the public right-of-way at 402 East Mifflin Street. (2nd AD)
Body
WHEREAS, the building at 402 East Mifflin Street is owned by John Neis and Michelle Isaac, and;
WHEREAS, the property owners contracted and paid for the closure in place of an underground storage vault from the public right-of-way at said property in 2019, and;
WHEREAS, the City of Madison General Ordinance 10.31 (4) (c) established a policy to reimburse owners one-half the cost up to $10,000 of their out of pocket expenses which are not otherwise reimbursed for such vault removals, and;
WHEREAS, the total cost for said vault removal was $54,060.
NOW, THEREFORE, BE IT RESOLVED, that the City Engineer hereby authorized to disburse $10,000.00 to John Neis and Michelle Isaac for the maximum amount to remove an underground storage vault from the public right-of-way at 402 East Mifflin Street.