Madison, WI Header
File #: 87058    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Acacia Ridge Phase 9, Private Contract No. 9260.
Type: Resolution Status: Report of Officer
File created: 2/5/2025 In control: BOARD OF PUBLIC WORKS
On agenda: 2/25/2025 Final action:
Enactment date: Enactment #:
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Acacia Ridge Phase 9, Private Contract No. 9260 (District 9).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 9260 Street Schedule A complete.pdf, 2. Acacia Ridge Ph 9 Sanitary Schedule A Unit Cost.pdf, 3. Acacia Ridge Ph 9 Storm Schedule A Unit Cost.pdf
Fiscal Note
No City Funds required. Private Contract.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Acacia Ridge Phase 9, Private Contract No. 9260 (District 9).
Body
WHEREAS, East South Point, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Acacia Ridge Phase 9.


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 104,576.64

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 104,576.64
b) Sewer Laterals $ ____-0-

C) Investments in Capital (MSU Share) $ ____-0-

D) Total Plant Value $ 104,576.64

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $193,943.90.



4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:


· Honey Harvest Lane from White Sky Pass to East Lot Line of Lot 597.
· Turning Oak Lane from White Sky Pass to...

Click here for full text