Madison, WI Header
File #: 57238    Version: 1 Name: Recreate positions # 3807 and #4316 from Engineer 3, CG18, R10 to Engineer 4, CG18, R12 at the Water Utility, and reallocate incumbents K. Miess and P. Holmgren into the new positions.
Type: Resolution Status: Passed
File created: 8/27/2019 In control: Human Resources Department
On agenda: 9/17/2019 Final action: 9/17/2019
Enactment date: 9/23/2019 Enactment #: RES-19-00678
Title: Recreate positions # 3807 and #4316 from Engineer 3, CG18, R10 to Engineer 4, CG18, R12 at the Water Utility, and reallocate incumbents K. Miess and P. Holmgren into the new positions.
Sponsors: Satya V. Rhodes-Conway
Attachments: 1. PB Memo Water Utility Engineerng Section 8-2019.pdf

Fiscal Note

The annualized cost of the proposed reclassification is $18,714 (including benefits). The impact on the 2019 budget is approximately $4,678. Costs associated with the reclassification will be absorbed within the agency’s 2019 budget.

 

Title

Recreate positions # 3807 and #4316 from Engineer 3, CG18, R10 to Engineer 4, CG18, R12 at the Water Utility, and reallocate incumbents K. Miess and P. Holmgren into the new positions.

 

Body

Resolution that positions #3807 and #4316, currently identified as Engineer 3, CG18, R10, are deleted and recreated as Engineer 4, CG18, R12, in the Water Utility operating budget, and incumbents K. Miess and P. Holmgren are reallocated to the new positions, thereof.