Madison, WI Header
File #: 25182    Version: 1 Name: Create a new 1.0 FTE position of Architect 3-LTE in the Engineering Division budget to be posted and filled through an internal competitive process. Upon filling the position, the Architect 2 LTE (pos. #4309) assignment in the Engineering Division will b
Type: Resolution Status: Passed
File created: 1/26/2012 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 2/28/2012 Final action: 2/28/2012
Enactment date: 2/29/2012 Enactment #: RES-12-00121
Title: Create a new 1.0 FTE position of Architect 3-LTE in the Engineering Division budget to be posted and filled through an internal competitive process. Upon filling the position, the Architect 2 LTE (pos. #4309) assignment in the Engineering Division will be ended.
Sponsors: Paul R. Soglin
Attachments: 1. Architect1-3.pdf, 2. PBMemo Architect 2 LTE.pdf
Fiscal Note
Marginal costs for the remainder of 2012 are estimated at $3,839, or $5,256 including benefits.  Annualized costs are projected at $4,607, or $6,307 including benefits.  Funding is available within the 2012 Engineering Division Operating Budget.
 
Title
Create a new 1.0 FTE position of Architect 3-LTE in the Engineering Division budget to be posted and filled through an internal competitive process.  Upon filling the position, the Architect 2 LTE (pos. #4309) assignment in the Engineering Division will be ended.
 
Body
Resolution that a new 1.0 FTE position of Architect 3-LTE in Compensation Group 18, Range 10 is created in the permanent salary detail of the Engineering Division budget, to be filled through an internal competitive process.  Upon filling the position, the existing Architect 2 LTE assignment (position #4309) will end, thereof.