Madison, WI Header
File #: 20049    Version: 1 Name: Recreating the existing position (#1079) of Engineer 4 in the Engineering Division budget as a Principal Engineer 1 and reallocating the incumbent to the new position.
Type: Resolution Status: Passed
File created: 9/24/2010 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 10/19/2010 Final action: 10/19/2010
Enactment date: 10/20/2010 Enactment #: RES-10-00845
Title: Recreating the existing position (#1079) of Engineer 4 in the Engineering Division budget as a Principal Engineer 1 and reallocating the incumbent to the new position.
Sponsors: David J. Cieslewicz
Attachments: 1. PBMemo Engineer 4 (2).pdf, 2. Position Description.pdf, 3. PrincipalEngineer1-2.pdf, 4. Trans Curret Structure.pdf, 5. Trans Proposed Org Structure.pdf
Fiscal Note
Costs for the remainder of the Year 2010 are estimated at $607, or $856 including benefits.  Funding is available within the 2010 Engineering Division Operating Budget by means of salary savings management.  Projected costs for the Year 2011 are $3,510, or $4,946 including benefits.  Funding will be provided within the 2011 Adopted Operating Budget by means of salary savings adjustment.  No additional appropriation is anticipated.
Title
Recreating the existing position (#1079) of Engineer 4 in the Engineering Division budget as a Principal Engineer 1 and reallocating the incumbent to the new position.
Body
Resolution that position #1079 of "Engineer 4" in Compensation Group 18, Range 12, in the permanent salary detail of the Engineering Division budget is deleted and recreated as a "Principal Engineer 1" in Compensation Group 18, Range 15, and that the incumbent, C. Petykowski, is reallocated to the new position, thereof.