...Fiscal Note
The proposed resolution authorizes the amendment of a non-competitive selection contract with Short Elliott Hendrickson, Inc. (SEH) for design services related to the reconstruction of Madison Water Utility's Unit Well 12 in an amount not to exceed $400,000. Funding for the amendment and original Unit Well 12 costs is available in the Water Utility's 2025 Adopted Capital Budget (Munis #10452). The original service contract with SEH was below the competitive selection threshold. No additional appropriation is required.
...Title
Authorizing the amendment of a non-competitive selection contract with Short Elliott Hendrickson, Inc. for design services related to the reconstruction of Madison Water Utility’s Unit Well 12 (District 11)
...Body
WHEREAS, Madison Water Utility’s (MWU) Unit Well 12 (801 South Whitney Way) was established in 1958. It operates year-round and delivers water to Madison’s Near West neighborhoods including University Hill Farms, Sunset Village, Midvale Heights, Westmorland, Crawford-Marlborough-Nakoma, Orchard Ridge, Summit Woods, Meadowood, Allied Dunn’s Marsh, Arbor Hills and Leopold. In 2024, Unit Well 12 pumped 550 million gallons compared to its 5-year average of 559 million gallons annually. The site consists of a well pump house and a detached 150,000 gallon above-ground water reservoir, and
WHEREAS, in 2014, Short Elliott Hendrickson, Inc. (SEH) was selected through a competitive request for proposal process as the engineering consultant to work with MWU on the design of a concept that would allow Unit Well 12 to operate as a dual-pressure zone facility, and
WHEREAS, through 2018, SEH established plans and specifications for a Public Works project to be bid and constructed for Unit Well 12, however the project bidding process was ultimately delayed, and
WHEREAS, in 2024, to re-initiate and fund the Unit Well 12 project for 2026 construction, MWU filed its Intent to Apply (ITA) with the Wisconsin DNR for the 2026 fiscal ye...