Fiscal Note
The proposed resolution approves plans for the 2018 Citywide installation and repair of sidewalk, curb, and gutter at an estimated cost of $466,000. Funding is provided by GO Borrowing within the Engineering Bicycle and Pedestrian Sidewalk Program (MUNIS 11771).
Title
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2018.
Body
BE IT RESOLVED,
1) That the plans and specifications for Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2018, be and are hereby approved.
2) That the Board of Public Works be and is hereby authorized to advertise and receive bids for said project.
3) That the Mayor and City Clerk are hereby authorized to sign and grant easements or right-of-way release or procurement documents, maintenance agreements or encroachment agreements, as necessary and grant or accept dedication of lands and/or easements from/to the Developer/Owner for public improvements located outside of existing public fee title or easement right-of-ways.