File #: 78406    Version: 1 Name: Approving Plans & Specifications For the Autumn Ridge Ped/Bike Bridge Project (Milwaukee St to Ziegler Rd) and authorizing the Mayor and City Clerk to execute an agreements with the State of Wisconsin Department of Transportation for the Project.
Type: Resolution Status: Passed
File created: 6/14/2023 In control: Engineering Division
On agenda: 7/11/2023 Final action: 7/11/2023
Enactment date: 7/14/2023 Enactment #: RES-23-00477
Title: Approving Plans & Specifications For the Autumn Ridge Ped/Bike Bridge Project (Milwaukee St to Ziegler Rd) and authorizing the Mayor and City Clerk to execute an agreements with the State of Wisconsin Department of Transportation for the Project. (3rd AD)
Sponsors: BOARD OF PUBLIC WORKS, Derek Field
Attachments: 1. 5992-11-11_pre pln(Autumn Ridge Path).pdf, 2. autumn ridge project map.pdf, 3. Autumn Ridge rendering.pdf
Fiscal Note
The proposed resolution approves plans and specifications for the Autumn Ridge Pedestrian and Bicycle Path (Munis project # 11859). The total estimated project cost is $6,209,300.16. The City applied for and received $2,520,000 in federal funding for the project. The remaining project costs will be paid through local funds. The 2023 Capital Improvement Plan (CIP) planned for local funding in 2024. This was included in Engineering’s 2024 capital budget request and would need to be included in the 2024 adopted capital budget to be appropriated.

In addition, the resolution authorizes the Mayor and City Clerk to execute agreements for the project, including agreements with the State of Wisconsin Department of Transportation, MG&E, AT&T, and Charter.
Title
Approving Plans & Specifications For the Autumn Ridge Ped/Bike Bridge Project (Milwaukee St to Ziegler Rd) and authorizing the Mayor and City Clerk to execute an agreements with the State of Wisconsin Department of Transportation for the Project. (3rd AD)
Body
PREAMBLE

WHEREAS,
The City is proposing to improve install a new pedestrian and bicycle path from Milwaukee Street to Ziegler Road. The project includes a new ped/bike overpass bridge over State Highway 30. The path will be constructed as 10’ wide and lighting will be installed along the route. The City applied for Federal Funding with the Surface Transportation Program - Urban and the project received approval for $2,520,000 in federal funding.
The project will be constructed under a contract let by the Wisconsin Department of Transportation (WisDOT) and a project Agreement with WisDOT will be required for funding, oversight and construction. The proposed project is planned for construction in the years 2024 & 2025.

The City of Madison and the WisDOT propose to enter into an agreement for construction and cost sharing of the proposed project. The basis for cost sharing participation is as follows:

1) Design Engineerin...