Fiscal Note
The cost for the remainder of 2013 is approximately $1,400 (or $1,600 including benefits) and is available in the Water Utility budget. The projected annualized cost is $9,600 (or $11,000 including benefits).
Title
Create a new 1.0 FTE position of Water Community Outreach Specialist in the Water Utility Budget in CG18, Range 4 to be filled through internal competition. Upon filling the position, the non-represented position (#1859) of Secretary 1 (CG17/R10) will be deleted.
Body
Resolution that a new 1.0 FTE position of Water Community Outreach Specialist is created in the Water Utility Budget in CG18, Range 4, to be filled through internal competition. Upon filling the position, the non-represented position (#1859) of Secretary 1 (CG17/R10) will be deleted, thereof.