File #: 87424    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Sugar Maple – Phase 3, Private Contract No. 2420.
Type: Resolution Status: Passed
File created: 3/3/2025 In control: Engineering Division
On agenda: 3/25/2025 Final action: 3/25/2025
Enactment date: 3/31/2025 Enactment #: RES-25-00194
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Sugar Maple - Phase 3, Private Contract No. 2420 (District 1).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2420 Street Schedule A excluding bituminous.pdf, 2. Sugar Maple Ph 3 Sanitary Schedule A Unit Cost.pdf, 3. Sugar Maple Ph 3 Storm Schedule A Unit Cost.pdf
Fiscal Note
No City Funds required. Private Contract.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Sugar Maple - Phase 3, Private Contract No. 2420 (District 1).
Body
WHEREAS, Sugar Maple Lane, LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Sugar Maple - Phase 3.


NOW, THEREFORE, BE IT RESOLVED

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 61,317.49

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 61,317.49
b) Sewer Laterals $ ____-0-

C) Investments in Capital (MSU Share) $ ____-0-

D) Total Plant Value $ 61,317.49

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $122,724.18.



4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:


· Ancient Oak Lane from Cherry Blossom Drive to Sugar Maple Lane.
· Cherry Blossom Drive from North Line of Lot ...