Fiscal Note
The proposed resolution authorizes an amendment to an existing contract for design services for the total amount of $31,774.00. The new contract as amended will total $416,812.00.
Authorized funding for $31,774.00 is available the adopted 2019 capital budget provides for $7,570,000 in GO Borrowing and Stormwater Utility reserves for the Citywide Flood Mitigation program (MUNIS 11513).
Title
Authorizing the Mayor and City Clerk to execute Amendment No. 5 to the existing Purchase of Services contract between the City of Madison and Brown and Caldwell for engineering design services for the West Wingra Watershed Study. (10th, 11th, 13th, 14th, 19th & 20th Ads)
Body
PREAMBLE
The City of Madison Engineering Division is proposing to conduct watershed and flood studies for the west and near west sides as a result of extreme rain events over the past several years. The City entered into an agreement with Brown and Caldwell for engineering services (RES-19-00206). The City Engineer requested engineering services and recommend that they be undertaken by Brown and Caldwell for the West Wingra Watershed Study as defined below:
1. Convert models to XP-SWMM.
2. Modify approach and add additional analysis for peak flow control proposed solutions.
NOW THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to execute and Amendment 5 to the contract between the City of Madison and Brown and Caldwell for additional engineering services for West Wingra Watershed Study.