Fiscal Note
No appropriation required.
Title
Report of Engineering of Non-Bid Contract for Everglade Drive Storm Sewer Extension. (19th AD)
Body
The attached report has been prepared by City Engineering pursuant to the requirements of Wis. Stat. Sec. 62.15(14) and MGO Sec. 33.07(6)(b).