File #: 37409    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street and terrace restoration constructed by Private Contract In Don Miller Redevelopment (754 E. Washington Avenue and 741 E. Mifflin Street), Private Contract No. 2301
Type: Resolution Status: Passed
File created: 2/24/2015 In control: BOARD OF PUBLIC WORKS
On agenda: 3/17/2015 Final action: 3/17/2015
Enactment date: 3/18/2015 Enactment #: RES-15-00241
Title: Accepting sanitary sewer, storm sewer, and street and terrace restoration constructed by Private Contract In Don Miller Redevelopment (754 E. Washington Avenue and 741 E. Mifflin Street), Private Contract No. 2301.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2301 sanitary sched a.pdf, 2. 2301 storm sched a.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
3/17/20151 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
3/4/20151 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
2/24/20151 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
Private Contract, No City Funds Are Required.
Title
Accepting sanitary sewer, storm sewer, and street and terrace restoration constructed by Private Contract In Don Miller Redevelopment (754 E. Washington Avenue and 741 E. Mifflin Street), Private Contract No. 2301.
Body
WHEREAS, The Constellation Project, LLC has satisfactorily completed the installation of sanitary sewer, storm sewer, and street and terrace restoration by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in:  Don Miller Redevelopment (754 E. Washington Avenue and 741 E. Mifflin Street).  
 
NOW, THEREFORE, BE IT RESOLVED
 
1.  That said sanitary sewer, storm sewer, and street and terrace restoration be and are hereby accepted.  
 
2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".  
 
SANITARY SEWER ACCOUNTING DATA
 
A)      Total Contract Value (including Engineering
      and Miscellaneous Costs)                  $      3,025.00      
 
B)      Contributions in Aid of Construction:
      a)      Public Sewer Components            $      3,025.00      
      b)      Sewer Laterals                  $      -0-            
 
C)      Investments in Capital (MSU Share)      $      -0-            
 
D)      Total Plant Value                        $      3,025.00      
 
 
 
 
3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".  
 
 
Increase in Total Plant Value per Schedule "A"      $2,805.00.
 
4.  That said street and terrace restoration are hereby accepted.