Fiscal Note
The proposed resolution revises the plans and specifications for the Pflaum Road Resurfacing Assessment District - 2025 to narrow the roadway to include a new 8-10 foot wide grade separated shared use path or cycle track along the norht side of Pflaum Road. The total estimated cost and assessments are unchanged from the original approved resolution. RES-25-00234 (Legistar #87631) approved on April 15, 2025, authorized funding for the total estimated cost of the project of $4,697,750 comprised of $4,324,483.40 in City costs and $373,266.60 in assessments. Funding for the City portion of costs is available in the 2025 Adopted Capital Budgets for Engineering - Major Streets (Munis #14781 - $3,145,250) and Water Utility (Munis #15169 - $1,552,500). No additional appropriation is required.
Title
Revising the Plans and Specifications for the Pflaum Road Resurfacing Assessment District - 2025 (District 15).
Body
The revised geometrics were approved by the Transportation Commission on 10/8/2025 (file # 90283). The Board of Public Works and the City Engineer having made reports of all proceedings in relation to the improvement of Pflaum Road Resurfacing Assessment District - 2025, pursuant to a resolution of the Common Council, Resolution No. 25-00150, ID No 87252, adopted 3/14/25, which resolution was adopted thereto, and the provisions of the Madison General Ordinances and the Wisconsin Statutes in such case made and provided, and the Common Council being fully advised.
BE IT HERBY RESOLVED:
1. That the geometrics for the Pflaum Road Resurfacing Assessment District- 2025 adopted in RES-25-00234 are hereby revised to narrow the roadway to include a new 8-10 foot wide grade separated shared use path or cycle track along the north side of Pflaum Road for the entire length of the project.