Madison, WI Header
File #: 48305    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Secret Places - Phase 10, Private Contract No. 2354.
Type: Resolution Status: Passed
File created: 8/3/2017 In control: BOARD OF PUBLIC WORKS
On agenda: 9/5/2017 Final action: 9/5/2017
Enactment date: 9/8/2017 Enactment #: RES-17-00687
Title: Accepting bituminous surface pavement constructed by Private Contract in Secret Places - Phase 10, Private Contract No. 2354.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 2354 bituminous Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
9/5/20171 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
8/23/20171 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
8/3/20171 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No City Funds Are Required.

Title

Accepting bituminous surface pavement constructed by Private Contract in Secret Places - Phase 10, Private Contract No. 2354.

Body

WHEREAS, MREC VH Madison Investors, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  Secret Places Phase 10.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

 

                     Bellingrath Street from the north line of Lot 54 to Red Barn Run

                     Bellingrath Court from Red Barn Run to the north end

                     Red Barn Run from the west plat line of Lot 33

                     Hickory Nut Court from the south line of Lot 190 (existing street) to the south end

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B2354 by $20,062.85 for a useful life of 40 years.