Title: Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 4 and 8) by the Common Council. (4th & 8th ADs)
Sponsors: Michael E. Verveer, BOARD OF PUBLIC WORKS
Attachments: 1. Ald Dist 4 Map_Include w Ordered Repairs.pdf, 2. Ald Dist 8 Map_Include w Ordered Repairs.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
3/3/20201 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25Pass Action details Meeting details Not available
2/19/20201 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
2/13/20201 Engineering Division Refer  Action details Meeting details Not available
Fiscal Note
The proposed resolution approves plan documents for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 4 and 8) by the Common Council. The estimated cost of this work is $1,170,000, of which $455,000 is assessable. Funding is available in the 2020 Adopted Capital Budget Engineering - Bicycle and Pedestrian Sidewalk Program in the following MUNIS accounts.
12612-403-200 $670,000
12613-403-200 $400,000
12915-403-200 $100,000
Title
Approving plans and specifications and authorizing the Board of Public Works to advertise and receive bids for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 4 and 8) by the Common Council. (4th & 8th ADs)
Body
The Common Council adopted a plan in 1996 to repair defective sidewalk throughout the City on a ten-year cycle. The plan was updated in 2002 and 2012 to reflect the completed work and to incorporate the reconstituted aldermanic districts. The 4th and 8th Aldermanic Districts have been scheduled for repair in 2020.

Offset, settled or badly cracked sidewalk sections are replaced with this program. Costs for the improvement of sidewalk are assessed to the various parcels based on assessable frontage in accordance with the City of Madison Policy for the Assessment of Street Improvements. The program is also used to install curb ramps at intersections. Curb ramps are funded solely by the City. Additionally, in an effort to make Madison Metro Transit bus stops ADA compliant, multiple locations will be improved by adding concrete boarding pads. Bus pads are funded solely by the City.

NOW THEREFORE BE IT RESOLVED that the plans and specifications for the Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered (Districts 4 and 8) by the Common Council be and are hereby approved:

BE IT FURTHER RESOLVED t...