Fiscal Note
The proposed resolution authorizes an amendment to the existing contract for engineering services for the total amount of $36,804.00. The new contract as amended will total $255,031.53.
Authorized funding for $36,804.00 is available in the adopted 2019 capital budget which provides for $7,570,000 in GO Borrowing and Stormwater Utility reserves for the Citywide Flood Mitigation program (MUNIS 11513).
Title
Authorizing the Mayor and the City Clerk to execute Amendment No. 2 to the existing Purchase of Services contract between the City of Madison and Brown and Caldwell for engineering services for the Stricker’s/Mendota Watershed Study. (19th AD)
Body
PREAMBLE
The City of Madison Engineering Division is proposing to conduct watershed and flood studies for the west and near west sides as a result of extreme rain events over the past several years. The City entered into an agreement with Brown and Caldwell for engineering services (RES-19-00205). The City Engineer requested additional engineering services and recommend that they be undertaken by Brown and Caldwell for the Stricker’s/Mendota Watershed Study as defined below:
1. Additional analysis for peak flow control solutions
NOW THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to execute and Amendment 2 to the contract between the City of Madison and Brown and Caldwell for additional design services for Stricker’s/Mendota Watershed Study.