File #: 04629    Version: Name: 11/7 SECOND SUB - Approving Geometrics for Monona Drive from W. Broadway to Station 59+00, a point approximately 250 feet south of the Pflaum Road/Nichols Road intersection.
Type: Resolution Status: Passed
File created: 9/27/2006 In control: PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION (ended 6/2018)
On agenda: 11/7/2006 Final action: 11/7/2006
Enactment date: 11/8/2006 Enactment #: RES-06-00925
Title: SECOND SUBSTITUTE - Approving Geometrics for Monona Drive from W. Broadway to Station 59+00, a point approximately 250 feet south of through the Pflaum Road/Nichols Road intersection. (includes roundabout at Pflaum/Nichols intersection). (16th AD / City of Monona)
Sponsors: Judy Compton
Attachments: 1. Monona Drive Project Description Sheet.pdf, 2. memo from Ald. Compton.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
11/7/20063 COMMON COUNCIL AdoptPass Action details Meeting details Not available
10/30/20062 BOARD OF ESTIMATES (ended 4/2017) Return to Lead with the Recommendation for ApprovalPass Action details Meeting details Not available
10/30/20063 Transportation Department Fiscal Note Required / Approval  Action details Meeting details Not available
10/30/20063 Finance Dept/Approval Group Approved Fiscal Note By The Comptroller's Office (SUBSTITUTES)   Action details Meeting details Not available
10/30/20063 BOARD OF PARK COMMISSIONERS Return to Lead with the Following Recommendation(s)  Action details Meeting details Not available
10/24/20063 PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION (ended 6/2018) RECOMMEND TO COUNCIL WITH THE FOLLOWING RECOMMENDATIONS - REPORT OF OFFICERPass Roll call Meeting details Not available
10/23/20062 Engineering Division Fiscal Note Required / Approval  Action details Meeting details Not available
10/23/20062 Finance Dept/Approval Group Approved Fiscal Note By The Comptroller's Office (SUBSTITUTES)   Action details Meeting details Not available
10/19/20061 LONG RANGE TRANSPORTATION PLANNING COMMITTEE (ended 6/2018) Return to Lead with the Following Recommendation(s)Pass Action details Meeting details Not available
10/18/20062 BOARD OF PUBLIC WORKS Return to Lead with the Recommendation for ApprovalPass Action details Meeting details Not available
10/16/20061 PLAN COMMISSION Return to Lead with the Recommendation for ApprovalPass Action details Meeting details Not available
10/3/20061 COMMON COUNCIL Refer  Action details Meeting details Not available
10/3/20061 PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION (ended 6/2018) Refer  Action details Meeting details Not available
10/3/20061 PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION (ended 6/2018) Refer  Action details Meeting details Not available
10/3/20061 PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION (ended 6/2018) Refer  Action details Meeting details Not available
10/3/20061 PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION (ended 6/2018) Refer  Action details Meeting details Not available
10/3/20061 PEDESTRIAN/BICYCLE/MOTOR VEHICLE COMMISSION (ended 6/2018) Refer  Action details Meeting details Not available
9/27/20061 Engineering Division Fiscal Note Required / Approval  Action details Meeting details Not available
9/27/20061 Finance Dept/Approval Group Approved Fiscal Note By The Comptroller's Office  Action details Meeting details Not available
9/27/20061 Engineering Division Referred for Introduction  Action details Meeting details Not available
Fiscal Note
No funds required.
Title
SECOND SUBSTITUTE - Approving Geometrics for Monona Drive from W. Broadway to Station 59+00, a point approximately 250 feet south of through the Pflaum Road/Nichols Road intersection. (includes roundabout at Pflaum/Nichols intersection). (16th AD / City of Monona)
Body
PREAMBLE

The City of Monona, Dane County and City of Madison have proposed a joint project to reconstruct Monona Drive (CTH "BB") from W. Broadway to Cottage Grove Road. The existing pavement is in poor condition and in need of reconstruction. Portions of Monona Drive are in the City of Madison and other portions City of Monona. The construction cost of the highway improvements will be financed with 80 percent Federal/State funds and 20 percent local funds.

The portion of Monona Drive from W. Broadway thru through the Pflaum Road/Nichols Road intersection is scheduled for construction in 2008 and is currently in the final design stage. The engineering consulting firm hired to prepare plans and specifications, Strand Associates, Inc., has prepared geometrics for the reconstruction of this segment of Monona Drive.

However, the Phase 1 portion of the project budget exceeds available funds and the Nichols Schools Historical issues are still in the process of being resolved. To address these issues, the intersection of Monona Drive and Pflaum Road/Nichols Road is being moved to Phase 3 of the Monona Drive Project, which is currently scheduled for 2012.

NOW THEREFORE BE IT RESOLVED that Geometrics for Monona Drive from W. Broadway to Section 59+00, a point approximately 250 feet south of thru the Pflaum Road/Nichols Road intersection (includes roundabout at Pflaum/Nichols intersection) are hereby approved.

BE IT FURTHER RESOLVED that (1) an effective wider bike lane area be provided by pouring the curb and gutter integral with the next sixteen (16) feet of roadway such that there is no...