File #: 85890    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Village at Autumn Lake Phase 12 Surface Paving, Private Contract No. 9099 (District 17).
Type: Resolution Status: Report of Officer
File created: 10/29/2024 In control: BOARD OF PUBLIC WORKS
On agenda: 11/26/2024 Final action:
Enactment date: Enactment #:
Title: Accepting bituminous surface pavement constructed by Private Contract in Village at Autumn Lake Phase 12 Surface Paving, Private Contract No. 9099 (District 17).
Attachments: 1. 9099 Streets Schedule A bituminous.pdf

Fiscal Note

No City Funds required. Private Contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in Village at Autumn Lake Phase 12 Surface Paving, Private Contract No. 9099 (District 17).

Body

WHEREAS, VAL, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  Village at Autumn Lake Phase 12 Surface Paving.

 

NOW, THEREFORE, BE IT RESOLVED

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

 

                     Autumn Lake Parkway from 159 FT NE of Tori Frost Drive to Sanctuary Drive.

                     Autumn Lake Parkway from Sanctuary Drive to E of Lot 1184.

                     Sanctuary Drive from Autumn Lake Parkway to Spring Dreams Lane.

                     Sanctuary Drive from Spring Dreams Lane to Waterfall Way.

                     Sanctuary Drive from Waterfall Way to Felland Road.

                     Waterfall Way from Sanctuary Drive to 295 FT N of Sanctuary Drive.

                     Waterfall Way from E of Lot 1205 to Sanctuary Drive.

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 13856 by $42,959.26 for a useful life of 40 years.