Fiscal Note
The position is funded in the 2024 adopted operating budget. No additional appropriation required.
Title
Create new classification series of Transit Engineer 1-2 in CG44, Ranges 10 & 12 in the salary schedule; and create 1.0 FTE position as Transit Engineer 2 in CG44/R12 in Metro Transit's 2024 adopted operating budget.
Body
Resolution to create new classification series of Transit Engineer 1-2 in CG44, Ranges 10 &12, respectively in the salary schedule; and create 1.0 FTE position as Transit Engineer 2 in CG44/R12 in the permanent salary detail of Metro Transit's 2024 adopted operating budget, thereof.