Fiscal Note
The cost for the remainder of 2005 is approximately $1676 (or $2245, including benefits) is available in Engineering Division budget. The projected annualized cost is $3744 (or $5017, including benefits).
Title
That the position of (#3563) of Construction Inspector 1 in Compensation Group15, Range 09, (occupied by B.Schotthauer) in the permanent salary detail of the Engineering Division budget is repealed and recreated as a position of Construction Inspector 2 in Compensation Group15, Range 11, thereof, and that the incumbent shall be reallocated to said position.
Body
BE IT HEREBY RESOLVED that the position of (#3563) of Construction Inspector 1 in Compensation Group15, Range 09, (occupied by B.Schotthauer) in the permanent salary detail of the Engineering Division budget is repealed and recreated as a position of Construction Inspector 2 in Compensation Group15, Range 11, thereof.
BE IT FURTHER RESOLVED that the incumbent shall be reallocated to said position.