Legislation Details

File #: 95538    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Southern Addition to Birchwood Point Phase 6 - Surface Paving, Private Contract No. 9218.
Type: Resolution Status: Items Referred
File created: 11/10/2026 In control: BOARD OF PUBLIC WORKS
On agenda: 12/8/2026 Final action:
Enactment date: Enactment #:
Title: Accepting bituminous surface pavement constructed by Private Contract in Southern Addition to Birchwood Point Phase 6 - Surface Paving, Private Contract No. 9218 (District 9)
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 9218 Streets Schedule A bituminous.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in Southern Addition to Birchwood Point Phase 6 - Surface Paving, Private Contract No. 9218 (District 9)

Body

WHEREAS, VH BIRCHWOOD SOUTH, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  Southern Addition to Birchwood Point Phase 6 - Surface Paving.

 

NOW, THEREFORE, BE IT RESOLVED

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

•                     Barn Swallow Circle from 307 FT S of Amber Nest Road to Amber Nest Road

•                     Amber Nest Road from 130 FT W of Barn Swallow Circle to Barn Swallow Circle

•                     Barn Swallow Circle from Amber Nest Road to Hazy Sky Parkway

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 14343 by $20,800.64 for a useful life of 40 years.