Madison, WI Header
File #: 43623    Version: 1 Name: Recreate the 1.0 FTE position #1886 of Computer Mapping/GIS Coordinator in CG18, R13 and reallocate the incumbent (P. Braselton) to the new position, in the Water Utility operating budget.
Type: Resolution Status: Passed
File created: 7/6/2016 In control: PERSONNEL BOARD
On agenda: 8/2/2016 Final action: 8/2/2016
Enactment date: 8/8/2016 Enactment #: RES-16-00560
Title: Recreate the 1.0 FTE position #1886 of Computer Mapping/GIS Coordinator in CG18, R13 and reallocate the incumbent (P. Braselton) to the new position, in the Water Utility operating budget.
Sponsors: Paul R. Soglin
Attachments: 1. PB Memo Comp Map GIS Coord 7-2016.pdf, 2. 2016_04_26 Signed PD.pdf, 3. Computer Mapping GIS Coordinator CD 6-2016.pdf, 4. Water Utility-2016_04 - Org Chart.pdf

Fiscal Note

The annualized cost for this reclassification translates to $7,476 (including benefits).  The impact on the 2016 operating budget is approximately $3,437.  Costs associated with the reclassification will be absorbed within the Water Utility’s 2016 budget.

Title

Recreate the 1.0 FTE position #1886 of Computer Mapping/GIS Coordinator in CG18, R13 and reallocate the incumbent (P. Braselton) to the new position, in the Water Utility operating budget.

Body

Resolution deleting and recreating the 1.0 FTE position #1886 as a Computer Mapping/GIS Coordinator in CG18, Range 13 and reallocating the incumbent (P. Braselton) into the new position in the permanent salary detail of the Water Utility operating budget, thereof.