Fiscal Note
The projected annualized cost of deleting a Water Meter Mechanic 2 (CG 16-11) and adding a Cross Connection Control Inspector (16-15) is $6,041 (or $8,512 including benefits). The Water Utility will need to manage their salary budget to accommodate this increase.
Title
Creating a new position (1.0 FTE) of Cross Connection Control Inspector in the Water Utility budget, and deleting a vacant Water Meter Mechanic 2 position.
Body
Resolution creating an additional 1.0 FTE of Cross Connection Control Inspector, Compensation Group 16, Range 15, in the Water Utility budget, and deleting a vacant Water Meter Mechanic 2 position (CG16-11), thereof.