Madison, WI Header
File #: 47795    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Grandview Commons Phase 11, Private Contract No. 1972.
Type: Resolution Status: Passed
File created: 6/23/2017 In control: BOARD OF PUBLIC WORKS
On agenda: 7/11/2017 Final action: 7/11/2017
Enactment date: 7/18/2017 Enactment #: RES-17-00574
Title: Accepting bituminous surface pavement constructed by Private Contract in Grandview Commons Phase 11, Private Contract No. 1972.
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 1972 bituminous Schedule A.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsWatch
7/11/20171 COMMON COUNCIL Adopt Under Suspension of Rules 2.04, 2.05, 2.24, and 2.25, and Close the Public HearingPass Action details Meeting details Not available
6/28/20171 BOARD OF PUBLIC WORKS RECOMMEND TO COUNCIL TO ADOPT UNDER SUSPENSION OF RULES 2.04, 2.05, 2.24, & 2.25 - REPORT OF OFFICERPass Action details Meeting details Not available
6/26/20171 Engineering Division Refer  Action details Meeting details Not available

Fiscal Note

Private Contract, No City Funds Are Required.

Title

Accepting bituminous surface pavement constructed by Private Contract in Grandview Commons Phase 11, Private Contract No. 1972.

Body

WHEREAS, MREC VH Madison, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  Grandview Commons Phase 11.

 

 

NOW, THEREFORE, BE IT RESOLVED

 

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

 

                     Traveler Lane from the west line of Lot 246 (existing street) to the east plat line (existing street); sidewalk on both sides

                     Callisto Drive (SB) from Traveler Lane to the south line of Lot 260 (existing street); sidewalk on the west side only

                     Callisto Drive (NB) from Traveler Lane to the south line of Lot 267 (existing street); sidewalk on the east side only

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 53B1972 by $20,043.53 for a useful life of 40 years.