File #: 80754    Version: 1 Name: Accepting bituminous surface pavement constructed by Private Contract in Eagle Trace Phase 4 - Surface Paving, Private Contract No. 8971
Type: Resolution Status: Passed
File created: 11/9/2023 In control: Engineering Division
On agenda: 12/5/2023 Final action: 12/5/2023
Enactment date: 12/13/2023 Enactment #: RES-23-00739
Title: Accepting bituminous surface pavement constructed by Private Contract in Eagle Trace Phase 4 - Surface Paving, Private Contract No. 8971 (District 9).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. 8971 Streets Schedule A bituminous.pdf

Fiscal Note

No City Funds required. Private contract.

Title

Accepting bituminous surface pavement constructed by Private Contract in Eagle Trace Phase 4 - Surface Paving, Private Contract No. 8971 (District 9).

Body

WHEREAS, VHET, LLC has satisfactorily completed the installation bituminous surface pavement by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, for:  Eagle Trace.

NOW, THEREFORE, BE IT RESOLVED

 

That the bituminous surface street improvements on the following streets be and are hereby accepted:

 

                     Tawny Elm Parkway from South line of Lot 175 to Ivory Dove Trail.

                     Tawny Elm Parkway from Ivory Dove Trail to North line of Lot 171.

                     Ivory Dove Trail from Tawny Elm Parkway to East line of Lot 33.

                     Rustic Rise Way from 502 FT N of White Fox Lane to 172 FT N of White Fox Lane.

 

The attached Schedule "A" representing the actual cost of construction of these improvements, which shall increase the street infrastructure value for Project No. 13298 by $9,102.63 for a useful life of 40 years.