Fiscal Note
Total Cost: $2,190,000
Federal Share: $919,815
Local Share: $1,270,185
Design Funds are available in Acct. No. 10228-402-170 $60,000
Construction funds will be required in a future Capitol Budget.
Construction is planned in 2019. Funding is included in the 2015-2020 Capital Improvement Program, Project #13, Engineering-Major Streets
Title
Authorizing the Mayor and City Clerk to execute an agreement with the State of Wisconsin Department of Transportation for the improvement of Buckeye Road (Monona Dr to Stoughton Rd) and authorizing the Mayor and City Clerk to execute an agreement with Dane County for cost sharing on the project. (15th AD)
Body
PREAMBLE
The City is proposing to reconstruct Buckeye Road (Monona Dr to Stoughton Rd) in 2019. The City applied for Federal Funds in the Surface Transportation Program Fund and the project received approval for 50% Federal funding of Construction.
The City of Madison and Dane County are all participating in the design and shall cost share the design engineering contract.
The project will be constructed under a contract let by the Wisconsin Department of Transportation (WisDOT) and a project Agreement with WisDOT will be required for funding, oversight and construction. The proposed project is planned for construction in the year 2019.
The City of Madison and WisDOT propose to enter into a agreement for construction and cost sharing of the proposed project. The basis for cost sharing participation is as follows:
1) Design Engineering: All design-engineering costs necessitated by the street reconstruction are 100% Local Funding.
2) Local Utilities: The City shall pay for 100% of the cost of installing or adjusting new water and sanitary sewer mains. The City assumes full responsibility for the design, installation, testing and operation of the sanitary sewer and water system. Each affected local municipality shall pay for 100% of...