Approving roadway geometry for the Mineral Point Road (Commerce Drive to S. High Point Road) & S. High Point Road (Mineral Point Road to north Greenway Drainage Property) (District 1)
Body
The Mineral Point Road project consists of reconstructing the concrete pavement and base course from the eastern Beltline Ramps to S. High Point Road. The project will include spot replacements of the existing curb and gutter and sidewalk. Improvements include safety enhancements at Tree Lane/Big Sky Drive and S. High Point Road intersections. There will be a large box culvert installation on Mineral Point Road from Commerce Drive to S. High Point Road and S. High Point Road to the north Greenway Drainage Property. A portion of the culvert will be installed by mico-tunneling and a portion installed by open trench. The pavement will be replaced on Mineral Point Road from Commerce Drive to the eastern Beltline Ramps and on S. High Point Road from Mineral Point Road to the north Greenway Drainage Property within the trench installation area. This is in the Pheasant Branch Watershed and the design of the box system will contribute to address flooding on the westside of the Beltline by Taco Bell/Target area. Portions of the existing street lighting system will be removed and replaced with new street lighting. The shared-use path along the north side of Mineral Point Road will remain as well as the BRT station on the east side of the S. High Point Intersection. The existing lane configuration inbound and outbound along Mineral Point Road and southbound S. High Point Road will remain. The northbound approach to S. High Point Road will change slightly from existing to include a dedicated left turn lane (match existing) as well as a shared left/thru/right lane (new configuration), and a bike lane (match existing).
The City retained Mead and Hunt for design services for the project. Two public informational meetings were held to present d...
Click here for full text