Fiscal Note
The proposed resolution authorizes an amendment to the existing contract with MSA Professional Services, Inc. for engineering services for the Nine Springs Watershed Study. This amendment (#1) extends the term of the initial contract through December 31, 2026, with no fiscal impact.
Title
Authorizing the Mayor and the City Clerk to execute Amendment No. 1 to the existing Purchase of Services contract between the City of Madison and MSA Professional Services, Inc. for engineering services for the Nine Springs Watershed Study. (District 10, District 14).
Body
PREAMBLE
The City of Madison Engineering Division is conducting watershed and flood studies as a result of extreme rain events over the past several years. The City entered into an agreement with MSA Professional Services, Inc. for engineering services related to flooding evaluation in the Nine Springs Watershed Study (RES-24-00395). The proposed amendment extends the contract period to December 31, 2026.
NOW THEREFORE BE IT RESOLVED that the Mayor and City Clerk are hereby authorized to execute Amendment 1 to the contract between the City of Madison and MSA Professional Services, Inc. to extend the contract term for the Nine Springs Watershed Study.