Madison, WI Header
File #: 04049    Version: 1 Name: Authorizing the Mayor and the City Clerk to enter into a contract with Ayres Associates for consulting services for surveying, planning and design of the Felland Neighborhood Sanitary Sewer (Phase 2) and Stormwater Survey and Design Project.
Type: Resolution Status: Passed
File created: 6/27/2006 In control: BOARD OF PUBLIC WORKS
On agenda: 7/18/2006 Final action: 7/18/2006
Enactment date: 7/20/2006 Enactment #: RES-06-00658
Title: Authorizing the Mayor and the City Clerk to enter into a contract with Ayres Associates for consulting services for surveying, planning and design of the Felland Neighborhood Sanitary Sewer (Phase 2) and Stormwater Survey and Design Project. (17th AD)
Sponsors: Common Council By Request
Fiscal Note
Funds are available in Acct. No. ES01-54950-810548-00-53W0370.  Estimated cost is $48,522.78
Title
Authorizing the Mayor and the City Clerk to enter into a contract with Ayres Associates for consulting services for surveying, planning and design of the Felland Neighborhood Sanitary Sewer (Phase 2) and Stormwater Survey and Design Project.  (17th AD)
Body
PREAMBLE
 
In preparation for planned development in the area, a sanitary sewer interceptor will be installed from 330' south of the intersection of Felland Road and Burke Road and extend to the north in proposed greenways (~1900') and within the Felland Road Right of Way (~1750') until it reaches the Nelson Road Lift Station.  The Lift Station will be taken out of service after this project is complete.  A second branch of this interceptor will extend from Felland Road northeasterly on the north side of the Wisconsin and Southern Railroad (~1250').  Consulting services to be completed include selection of the best corridor, field surveying, preparation of easement descriptions and maps, and detailed design of the interceptor and the associated greenways.
Be it Resolved that the Mayor and City Clerk are hereby authorized to execute a contract for Purchase of Services (Design Professionals) with Ayres Associates to perform surveying, planning and design of the Felland Neighborhood Sanitary Sewer(Phase 2) and Stormwater Survey and Design Project.