File #: 84736    Version: 1 Name: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Village at Autumn Lake Phase 12, Private Contract No. 9098.
Type: Resolution Status: Passed
File created: 8/7/2024 In control: Engineering Division
On agenda: 9/10/2024 Final action: 9/10/2024
Enactment date: 9/13/2024 Enactment #: RES-24-00524
Title: Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Village at Autumn Lake Phase 12, Private Contract No. 9098 (District 17).
Sponsors: BOARD OF PUBLIC WORKS
Attachments: 1. Village at Autumn Lake Ph 12 Sanitary Schedule A Unit Cost UPDATED Mar2023.pdf, 2. Village at Autumn Lake Ph 12 Storm Schedule A Unit Cost UPDATED Mar2023 (002).pdf, 3. 9098 Street Schedule A excluding bituminous.pdf
Fiscal Note
No City Funds required. Private Contract.
Title
Accepting sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) constructed by Private Contract In Village at Autumn Lake Phase 12, Private Contract No. 9098 (District 17).
Body
WHEREAS, VAL LLC, has satisfactorily completed the installation of sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) by private contract, in accordance with the City of Madison Standard Specifications for Public Works Construction, in: Village at Autumn Lake Phase 12.

NOW, THEREFORE, BE IT RESOLVED,

1. That said sanitary sewer, storm sewer, and street improvements (excluding bituminous surface pavement) be and are hereby accepted.

2. That said sanitary sewer improvements are hereby assigned to the Madison Sewer Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Sewer Utility's "Utility Plant In Service".

SANITARY SEWER ACCOUNTING DATA

A) Total Contract Value (including Engineering
and Miscellaneous Costs) $ 154,993.82

B) Contributions in Aid of Construction:
a) Public Sewer Components $ 154,993.82
b) Sewer Laterals $ ____-0-

C) Investments in Capital (MSU Share) $ ____-0-

D) Total Plant Value $ 154,993.82

3. That said storm sewer improvements are hereby assigned to the Madison Storm Water Utility for ownership and maintenance and that the attached Schedule "A" representing the actual cost of construction of these improvements shall be reflected in the Madison Storm Water Utility's "Utility Plant In Service".


Increase in Total Plant Value per Schedule “A” $217,380.20

4. That the street improvements, excluding the bituminous pavement, on the following streets be and are hereby accepted:


· Autumn Lake Parkway from 159 FT NE of Tori Frost Drive to Sanctuary Drive.
· Autumn Lake Parkway from ...