Fiscal Note
Costs for the remainder of 2010 are estimated at $495 of salary plus $202 of benefits, for a total of $697. Funding is available within the 2010 Engineering Operating Budget as a result of salary savings. Annualized costs for 2011 are projected at $3,432 of salary and $1,404 of benefits, for a total of $4,836. This amount will be included in the 2011 Adopted Operating Budget.
Title
Recreation of an Architect 2 position (#3260) as an Architect 3 in the Engineering Division budget and reallocating the incumbent to the new position.
Body
Resolution that the position of Architect 2 (#3260) in Compensation Group 18, Range 08, currently occupied by J. Zwart, in the permanent salary detail of the Engineering Division's budget is repealed and recreated as an Architect 3 in Compensation Group 18, Range 10, and that the incumbent is reallocated to the new position thereof.