Madison, WI Header
File #: 29204    Version: 1 Name: Recreating position #4109 as an Engineer 4 in the Engineering budget and reallocating incumbent Kay Schindel to the new position.
Type: Resolution Status: Passed
File created: 2/20/2013 In control: BOARD OF ESTIMATES (ended 4/2017)
On agenda: 3/19/2013 Final action: 3/19/2013
Enactment date: 3/20/2013 Enactment #: RES-13-00182
Title: Recreating position #4109 as an Engineer 4 in the Engineering budget and reallocating incumbent Kay Schindel to the new position.
Sponsors: Paul R. Soglin
Attachments: 1. PBMemo Engineer 4 Schindel 3-2013.pdf, 2. Engineer 4 Position Description.pdf, 3. Engineer 3 Position Description.pdf, 4. Engineer 4 Class Specification.pdf
Fiscal Note
Costs for the remainder of 2013 are estimated at $2,866, or $3,945 including benefits.  Funding is available in the Engineering Budget through the management of salary savings.  Annualized costs are projected at $7,036, or $9,618 including benefits  Funding will be requested as appropriate in future year operating budgets.
 
Title
Recreating position #4109 as an Engineer 4 in the Engineering budget and reallocating incumbent Kay Schindel to the new position.
 
Body
Resolution recreating the 1.0 FTE position #4109 from Engineer 3 (CG18, Range 10), to Engineer 4 (CG18, Range 12), in the Engineering Division budget and reallocating the incumbent, K. Schindel, to the new position, thereof.